Case Study: Southern Regional Water Pipeline Project
| Client: | Magic Door Industries |
|---|---|
| Commencement Date: | January 2008 |
| Duration of Work/Scope: | 10 months |
| Automation: | Magic Door Industries |
| Description of Work: | Design & Construct all gates per Toth Engineering design and clients recommendations. Work includes excavation, concreting and civil works. All gates are hot dipped galvanized after manufacture to prevent corrosion. Bundamba Pump Station 1 – 6m x 2.2m sliding gate 1 – 9m x 2.2m sliding gate Swanbank Pump Station 1 – 6m x 2.2m sliding gate North Beaudesert Balance Tank 1 – 6m x 2.2m swing gate with heavy duty swing post & catcher post Chambers Flat Pump Station 1 – 6m x 2.2m swing gate with heavy duty swing post & catcher post 1 – 17.7m x 2.2m sliding gate Stapylton Balance Tank 1 – 9m x 2.2m swing gate with heavy duty swing post & catcher post Coomera Pump Station 1 – 6m x 2.2m sliding gate Molendinar Pump Station 1 – 6m x 2.2m sliding gate |