Case Study: Russell Transport - Lytton
| Client: | Spaceframe Buildings Pty Ltd |
| Commencement Date: | August 2009 |
| Duration of Work/Scope: | 3 months |
| Automation: | M.D.I |
| Description of Work: | Design & Construct gate per Toth Engineering design and clients recommendations. Gate is 10.3m long to suit existing driveway measurements. Heavy duty operators installed to maneuver gate. Gate and posts all hot dipped galvanized after manufacture to prevent corrosion. |