Case Study: Mitchel Fine Foods - Banyo
| Client: | Spaceframe Buildings Pty Ltd |
| Commencement Date: | September 2009 |
| Duration of Work/Scope: | 3 months |
| Automation: | M.D.I |
| Description of Work: | Design & Construct gates per Toth Engineering design and clients recommendations. Each bi-parting gate is 14m long to suit existing driveway measurements, sliding and pedestrian gates are designed to match bi-parting gates. Heavy duty operators installed to maneuver gate. All gates were hot dipped galvanized after manufacture to prevent corrosion. |