Case Study: Darling Downs Power Station - Dalby
| Client: | Laing O'Rourke |
| Commencement Date: | October 2009 |
| Duration of Work/Scope: | 3 months |
| Automation: | M.D.I |
| Description of Work: | Design & Construct gates per Toth Engineering design and clients recommendations. Overall gate is approx. 11m long, with perimeter frames and support tower. All work is hot dipped galvanized after manufacture to prevent corrosion. |