Case Study: Redlands Performing Arts Centre - Cleveland
| Client: | McDonald Keen Group |
|---|---|
| Commencement Date: | 2007 |
| Duration of Work/Scope: | 8 months |
| Steel Tonnage: | Approx. 60 tonne |
| Description of Work: | Supply & Erect structural steel and purloins to erect building. Re-design Gnoman Structure for construction (by Toth Engineering) for build-ability per Engineers request. |