Case Study: RAAF Base, Amberley
| Client: | Abigroup Contractors |
|---|---|
| Commencement Date: | 2008 |
| Duration of Work/Scope: | Approx. 9 months |
| Steel Tonnage: | Approx 330 tonne |
| Description of Work: | 7 - Living-In-Accommodation (LIA) Buildings and 1 - MESS (Large Meals Area) Building, Supply & Erect structural steel, purlins, etc, to complete these building structures. The Feature Fascias were re-designed by Toth Engineering and approved for construction by Architect & Engineer, powder coated selected colour. |